Skip to primary content

Prime-WoW

My site, my way, no big company can change this

Prime-WoW

Main menu

  • Home
  • Discord
  • Forums
  • Games
    • 7DtD
      • 7DtD Map
      • 7DtD Official Forums
      • 7DtD Wiki
    • Minecraft
      • Survival Map
      • Vanilla Map
      • FTB Map
      • FTB Wiki
      • Download FTB Client
    • NWN
      • NWN Wiki
      • NWN Lexicon
      • NWN Vault
      • NWNX
      • NWN Info
      • Rhun Guide
    • Terraria
      • Terraria Map
    • WoW
      • Prime-WoW Site
      • WoW Armory
  • Unfiltered RSS
    • Bikes
    • Games
      • Kotaku
      • PS4 News
      • VR
    • Nature
      • TreeHugger
      • Survival
    • Technology
      • Hardware
        • Hot Hardware
      • Linux
        • Linux Today
        • LWN.net
        • LXer
        • Phoronix
        • RPi
      • LifeHacker
      • Akihabara News
      • AnandTech
      • Ars Technica
      • Engadget
      • Gear & Gadgets
      • Geekologie
      • Gizmodo
      • [H]ardOCP
      • io9
      • Slashdot
      • TG Daily

Post navigation

← Previous Next →

NASA delays SLS rocket rollout, says launch date is TBD

Posted on February 2, 2022 by Xordac Prime
The Space Launch System main engines are seen in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Jan. 10, 2022.

Enlarge / The Space Launch System main engines are seen in High Bay 3 of the Vehicle Assembly Building at NASA’s Kennedy Space Center on Jan. 10, 2022. (credit: NASA)

NASA officials on Wednesday said the agency would conduct an initial rollout of the massive Space Launch System rocket sometime in March, a multi-week delay attributed to “close-out” tasks that must be completed on the vehicle.

Until this week, NASA had been publicly targeting a February 15 rollout date, when a mobile tower would ferry the SLS rocket from the Vehicle Assembly Building to its launch site at Kennedy Space Center in Florida. Tom Whitmeyer, deputy associate administrator for exploration systems development at NASA Headquarters, said the agency is now targeting “mid-March” for the rollout, but he did not want to set a specific date.

Whitmeyer and other officials on a teleconference with reporters said they wanted to let the teams of NASA employees and contractors in Florida complete their work meticulously rather than being rushed.

Read 9 remaining paragraphs | Comments



Source: Ars Technica – NASA delays SLS rocket rollout, says launch date is TBD

This entry was posted in Ars Technica, Unfiltered RSS and tagged Ars Technica by Xordac Prime. Bookmark the permalink.
Proudly powered by WordPress