Skip to primary content

Prime-WoW

My site, my way, no big company can change this

Prime-WoW

Main menu

  • Home
  • Discord
  • Forums
  • Games
    • 7DtD
      • 7DtD Map
      • 7DtD Official Forums
      • 7DtD Wiki
    • Minecraft
      • Survival Map
      • Vanilla Map
      • FTB Map
      • FTB Wiki
      • Download FTB Client
    • NWN
      • NWN Wiki
      • NWN Lexicon
      • NWN Vault
      • NWNX
      • NWN Info
      • Rhun Guide
    • Terraria
      • Terraria Map
    • WoW
      • Prime-WoW Site
      • WoW Armory
  • Unfiltered RSS
    • Bikes
    • Games
      • Kotaku
      • PS4 News
      • VR
    • Nature
      • TreeHugger
      • Survival
    • Technology
      • Hardware
        • Hot Hardware
      • Linux
        • Linux Today
        • LWN.net
        • LXer
        • Phoronix
        • RPi
      • LifeHacker
      • Akihabara News
      • AnandTech
      • Ars Technica
      • Engadget
      • Gear & Gadgets
      • Geekologie
      • Gizmodo
      • [H]ardOCP
      • io9
      • Slashdot
      • TG Daily

Post navigation

← Previous Next →

Intel says Ohio “megafab” will begin making advanced chips in 2025

Posted on January 21, 2022 by Xordac Prime
Intel's rendering of its two new leading-edge processor factories planned to be built outside Columbus, Ohio.

Enlarge / Intel’s rendering of its two new leading-edge processor factories planned to be built outside Columbus, Ohio. (credit: Intel)

Intel announced the location of its megafab today, a 1,000-acre parcel on the outskirts of the Columbus, Ohio, metro area. The semiconductor manufacturer plans to break ground on two leading-edge fabs by the end of the year and enter production in 2025.

“This is all part of the strategy that our CEO Pat Gelsinger announced back in March,” Intel Senior Vice President Keyvan Esfarjani told Ars.

“We are starting with two fabs, and that’s all in line with the growing demand for what the industry needs,” he said. “It’s also critically important for the balance of the supply chain around the world.”

Read 13 remaining paragraphs | Comments



Source: Ars Technica – Intel says Ohio “megafab” will begin making advanced chips in 2025

This entry was posted in Ars Technica, Unfiltered RSS and tagged Ars Technica by Xordac Prime. Bookmark the permalink.
Proudly powered by WordPress