Skip to primary content

Prime-WoW

My site, my way, no big company can change this

Prime-WoW

Main menu

  • Home
  • Discord
  • Forums
  • Games
    • 7DtD
      • 7DtD Map
      • 7DtD Official Forums
      • 7DtD Wiki
    • Minecraft
      • Survival Map
      • Vanilla Map
      • FTB Map
      • FTB Wiki
      • Download FTB Client
    • NWN
      • NWN Wiki
      • NWN Lexicon
      • NWN Vault
      • NWNX
      • NWN Info
      • Rhun Guide
    • Terraria
      • Terraria Map
    • WoW
      • Prime-WoW Site
      • WoW Armory
  • Unfiltered RSS
    • Bikes
    • Games
      • Kotaku
      • PS4 News
      • VR
    • Nature
      • TreeHugger
      • Survival
    • Technology
      • Hardware
        • Hot Hardware
      • Linux
        • Linux Today
        • LWN.net
        • LXer
        • Phoronix
        • RPi
      • LifeHacker
      • Akihabara News
      • AnandTech
      • Ars Technica
      • Engadget
      • Gear & Gadgets
      • Geekologie
      • Gizmodo
      • [H]ardOCP
      • io9
      • Slashdot
      • TG Daily

Post navigation

← Previous Next →

NASA has begun a study of the SLS rocket’s affordability

Posted on March 15, 2021 by Xordac Prime
Artist concept of the Space Launch System.

Enlarge / Artist concept of the Space Launch System. (credit: NASA/MSFC)

NASA is conducting an internal review of the Space Launch System rocket’s affordability, two sources have told Ars Technica.

Concerned by the program’s outsized costs, the NASA transition team appointed by President Joe Biden initiated the study. The analysis is being led by Paul McConnaughey, a former deputy center director of NASA’s Marshall Space Flight Center in Huntsville, as well as its chief engineer.

The SLS rocket program has been managed by Marshall for more than a decade. Critics have derided it as a “jobs program” intended to retain employees at key centers, such as Alabama-based Marshall, as well as those at primary contractors such as Boeing, Northrop Grumman, and Aerojet Rocketdyne. Such criticism has been bolstered by frequent schedule delays—the SLS was originally due to launch in 2016, and the rocket will now launch no sooner than 2022—as well as cost overruns.

Read 10 remaining paragraphs | Comments



Source: Ars Technica – NASA has begun a study of the SLS rocket’s affordability

This entry was posted in Ars Technica, Unfiltered RSS and tagged Ars Technica by Xordac Prime. Bookmark the permalink.
Proudly powered by WordPress