Intel Investing $7 Billion Into Arizona's Stalled Fab 42 After President Trump’s Promise Of Tax Reform

Intel Investing $7 Billion Into Arizona's Stalled Fab 42 After President Trump’s Promise Of Tax Reform
Intel’s previously cancelled Fab 42, which calls Chandler, Arizona home, is back on again. Intel originally began construction on the chip plant back in 2011, but “paused” construction following the downturn in the PC market. “The new construction is going to be left vacant for now and it will be targeted at future technologies,” said Intel

Source: Hot Hardware – Intel Investing Billion Into Arizona’s Stalled Fab 42 After President Trump’s Promise Of Tax Reform