
Toward the end of August, Toyota was forced to shutter several manufacturing plants due to insufficient disk space on a system, causing a snowball effect of locked-up systems. While the issue was fixed after two days, it goes to show how it’s not just cyberattacks that can bring operations to a grinding halt.
In a recent blog post, Toyota
Source: Hot Hardware – Toyota Car Assembly Lines Grind To A Halt After Running Out Of Hard Drive Storage