{"id":1061112,"date":"2022-10-05T01:08:37","date_gmt":"2022-10-05T05:08:37","guid":{"rendered":"https:\/\/www.prime-wow.com\/?p=1061112"},"modified":"2022-10-05T01:08:37","modified_gmt":"2022-10-05T05:08:37","slug":"540mw-wind-farm-for-hokkaido","status":"publish","type":"post","link":"https:\/\/www.prime-wow.com\/?p=1061112","title":{"rendered":"540MW Wind Farm for Hokkaido"},"content":{"rendered":"<p>Akihabara News (Tokyo) \u2014 Toyota Tsusho, a Nagoya-based trading company, has begun construction of a 540MW wind farm on the northern tip of Hokkaido, according to a report by the Nikkei.<\/p>\n<p>While the companies involved in this project have yet to release their own information, the Nikkei states that the partners aim to send some of this electricity to energy-hungry Tokyo.<\/p>\n<p>Aside from Toyota Tsusho, the other partners are Cosmo Eco Power, a Tokyo-based wind power firm, and Looop, a Tokyo-based electric power retail business.<\/p>\n<p>Power generated at the plant, according to the Nikkei, will be sold to major power companies under a feed-in tariff scheme, and it will include a large-scale battery storage system.<\/p>\n<p>This project, aiming to begin operations next year, will double Hokkaido\u2019s wind-power capacity.<\/p>\n<p>The report does not explain how the partners intend to overcome the low-capacity electricity transmission link between Hokkaido and Honshu.<\/p>\n<p><strong>Recent Wind Power Related Articles<\/strong><\/p>\n<p><strong><a href=\"https:\/\/akihabaranews.com\/japans-first-8mw-offshore-wind-turbines\/\">Japan\u2019s First 8MW Offshore Wind Turbines<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/akihabaranews.com\/ge-turbines-for-aomori-wind-farm\/\">GE Turbines for Aomori Wind Farm<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/akihabaranews.com\/japans-approach-to-offshore-wind-energy\/\">Japan\u2019s Approach to Offshore Wind Energy<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/akihabaranews.com\/taiwan-offshore-wind-heads-to-round-3\/\">Taiwan Offshore Wind Heads to Round 3<\/a><\/strong><\/p>\n<p><strong><a href=\"https:\/\/akihabaranews.com\/turbine-raised-at-akita-offshore-wind-farm\/\">Turbine Raised at Akita Offshore Wind Farm<\/a><\/strong><\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/akihabaranews.com\/540mw-wind-farm-for-hokkaido\/\">540MW Wind Farm for Hokkaido<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/akihabaranews.com\">Akihabara News<\/a>.<\/p>\n<p>&#013;<br \/>\n&#013;<br \/>\nSource: Akihabara News &#8211; <a href=\"https:\/\/akihabaranews.com\/540mw-wind-farm-for-hokkaido\/?utm_source=rss&amp;utm_medium=rss&amp;utm_campaign=540mw-wind-farm-for-hokkaido\" target=\"_blank\" rel=\"noopener\">540MW Wind Farm for Hokkaido<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Akihabara News (Tokyo) \u2014 Toyota Tsusho, a Nagoya-based trading company, has begun construction of a 540MW wind farm on the northern tip of Hokkaido, according to a report by the Nikkei. While the companies involved in this project have yet &hellip; <a href=\"https:\/\/www.prime-wow.com\/?p=1061112\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"footnotes":""},"categories":[69,110],"tags":[74],"class_list":["post-1061112","post","type-post","status-publish","format-standard","hentry","category-akihabara-news","category-unfiltered-rss","tag-akihabara-news"],"_links":{"self":[{"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=\/wp\/v2\/posts\/1061112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1061112"}],"version-history":[{"count":0,"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=\/wp\/v2\/posts\/1061112\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1061112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1061112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.prime-wow.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1061112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}